Data Center Management

Service — Commissioning Agent

Commissioning
Agent
Services

Professional commissioning agent and authority services for data center operators seeking reliable, efficient, and compliant infrastructure.

L0–L6

Complete framework

CxA

Independent authority

ASHRAE

Standard compliance

What We Do

Your independent advocate
for quality and performance.

TerraWatt provides comprehensive Commissioning Management services. We act as your specialized Commissioning Agent (CxA), coordinating the entire quality assurance process.

Unlike testing contractors who focus on individual components, we take a holistic view — managing the schedule, creating checklists, leading meetings, and ensuring the design intent is fully realized in the final build.

Our Credentials

Hyperscale & Colocation

Data center expertise

ASHRAE& Uptime Standards

Independent Third-Party

Validation authority

The CxA Journey

Commissioning Authority
(CxA) Services

A complete seven-level framework from preconstruction planning through operational handover — ensuring every system performs as designed.

L0L1L2L3L4L5L6
L0Pre-Construction

1/7

Preconstruction & Documentation

Cx Specifications, test scripts, and planning before equipment arrives. OPR workshops, design reviews, and the master Cx Plan that defines how every system will be validated.

Deliverables

  • Cx Specifications & Planning
  • OPR Workshops
  • Design Reviews
  • Master Cx Plan Development
L1Procurement

2/7

Factory Testing

Witnessing Factory Acceptance Tests (FAT/FWT) at manufacturer facilities. Verifying equipment performance and configuration before it ships to site.

Deliverables

  • Factory Acceptance Tests (FAT)
  • Factory Witness Testing (FWT)
  • Pre-Shipment Config Verification
  • Manufacturing QA/QC
L2Construction

3/7

Installation Verification (QA/QC)

On-site quality control. Pre-Functional Checklists, installation inspections, and verification that equipment is installed per design and manufacturer requirements.

Deliverables

  • Pre-Functional Checklists (PFC)
  • Installation Inspections
  • Design Compliance Verification
  • QA/QC Reporting
L3Startup

4/7

Startup & Standalone Testing

Initial energization and standalone system testing. Each system is started, tuned, and validated independently before integration.

Deliverables

  • Equipment Energization
  • Startup Witnessing
  • Standalone Validation
  • Initial Tuning
L4Testing

5/7

Functional Performance Testing

Testing individual systems under operational conditions. Verifying each system performs per design intent across its full operating range.

Deliverables

  • Functional Performance Tests (FPT)
  • Operational Scenario Testing
  • Load Banking / Heat Load
  • Alarm & Interlock Verification
L5Integration

6/7

Integrated Systems Testing

Facility-wide validation. Black Building tests, failure scenario testing, and cross-system coordination to confirm redundancy and automatic response.

Deliverables

  • Integrated Systems Testing (IST)
  • Black Building Tests
  • Failure & Redundancy Scenarios
  • Cross-System Coordination
L6Handover

7/7

Closeout

Final Commissioning Report, Systems Manual, Operator Training, and handover. Seasonal/deferred testing schedules and transition to operations.

Deliverables

  • Final Commissioning Report
  • Systems Manuals
  • Operator Training
  • Seasonal/Deferred Testing

Why TerraWatt CxA

Benefits of Professional
Cx Management

Why leading data center operators choose TerraWatt as their Commissioning Authority (CxA)

↑Faster delivery

Speed to Market

Proactive issue identification during design and construction prevents schedule slippage and ensures on-time turnover.

↓Risk exposure

Risk Mitigation

Independent third-party validation eliminates single points of failure and verifies redundancy before critical loads are connected.

100%Ready at handover

Operational Readiness

We bridge the gap between construction and operations, ensuring your team is trained and systems manuals are complete from Day 1.

∞Lifespan optimization

Lifecycle Efficiency

Optimized control sequences and verified setpoints ensure the facility operates at peak efficiency for its entire lifespan.

Our Preferred Platform

Powered by
CxPlanner

CxPlanner

The industry's fastest commissioning software — delivering efficient project execution and real-time visibility for all stakeholders.

01Optimized testing checklists for PFC, FPT, and Cx
02System, equipment, and test tracking
03Automated commissioning reports and AI insights
04Document management and snagging
05Punch list tracking and overview
06Site inspections with mobile app

50%

Wasted work eliminated per year through streamlined workflows and automated reporting.

Say goodbye to slow processes and hello to efficient project delivery.

Learn More About CxPlanner

Get in touch

Let's talk
about your project.

Our team of experts is ready to help with your data center and substation commissioning needs.

Office
Radnička cesta 1A, Business park 1A, 10000 Zagreb, Croatia